Ordering steel might seem straightforward, but even small mistakes can lead to significant delays, wasted materials, and unexpected costs. For contractors, engineers, and builders, these errors can disrupt project timelines and eat into profits.
The good news? Most of these mistakes are entirely avoidable. In this blog, we’ll walk you through the five most common pitfalls when ordering steel and share tips on how to avoid them—plus, how TDT Powersteel can help you get it right the first time.
Mistake #1: Ordering the Wrong Type of Steel
The Problem:
Choosing the wrong type of steel can lead to structural issues and increased costs. For example, using mild steel instead of stainless steel in a coastal project can cause premature corrosion.
How to Avoid It:
- Know Your Requirements: Understand the specific needs of your project, including load-bearing capacity, corrosion resistance, and weldability.
- Consult the Experts: TDT Powersteel offers expert advice to help you select the right type of steel from their extensive catalog of over 1,000 products.
Pro Tip: Always request a material test certificate to verify the grade and quality of the steel.
Mistake #2: Incorrect Measurements and Quantities
The Problem:
Overestimating leads to wasted money, while underestimating causes delays and additional orders. Both scenarios are costly and can mess up your budget.
How to Avoid It:
- Double-Check Measurements: Ensure that your blueprints and order forms match precisely.
- Use a Steel Calculator: Utilize tools to estimate the required steel accurately.
- Get Professional Support: The team at TDT Powersteel can assist in calculating the right quantities based on your project’s specifications.
Pro Tip: Order a little extra (around 5-10%) to cover unexpected needs, but don’t go overboard.
Mistake #3: Ignoring Delivery Schedules
The Problem:
Many contractors overlook delivery lead times, causing project delays when steel doesn’t arrive as expected. This is especially problematic for large-scale projects with tight timelines.
How to Avoid It:
- Plan Ahead: Place orders well in advance, considering manufacturing and delivery times.
- Choose Reliable Suppliers: TDT Powersteel has a nationwide distribution network and a reputation for on-time deliveries, ensuring you get your steel when you need it.
- Track Your Orders: Make sure your supplier offers real-time tracking and clear communication.
Pro Tip: Schedule deliveries in phases to align with your project’s timeline, reducing storage issues and potential damage.
Mistake #4: Overlooking Certifications and Quality Standards
The Problem:
Using substandard steel can compromise the safety and longevity of your structure, leading to costly repairs or even legal liabilities.
How to Avoid It:
- Check Certifications: Ensure that the steel complies with international standards like ASTM, ISO, or local building codes.
- Buy only from Trusted Suppliers: Certified, high-quality steel that meets or exceeds industry standards.
- Inspect Upon Delivery: Check for labels, certifications, and any visible damage when the steel arrives.
Pro Tip: Request mill test certificates to verify the steel’s grade and chemical composition.
Mistake #5: Skipping Customized Solutions
The Problem:
Some projects have unique requirements that standard steel products can’t meet. Ordering standard sizes when you need custom cuts can result in wasted material and additional labor costs.
How to Avoid It:
- Opt for Custom Solutions: TDT Powersteel offers tailored-fit services, including custom sizes, coatings, and grades, ensuring you get precisely what you need without the waste.
- Consult Early: Discuss customization needs during the planning phase to avoid last-minute changes and delays.
Pro Tip: Custom orders might take a bit longer—plan for this in your timeline to prevent delays.